KC to perform resurfacing on Keslinger Road

By on June 15, 2013

KANE COUNTY—Pavement resurfacing work for Kane County’s 2013 Resurfacing Program is scheduled to take place from now until Friday, July 19, weather permitting, on the portion of Keslinger Road stretching from West County Line Road to Route 47.

The resurfacing process typically includes grinding and removal of 1.5 inches to 2.5 inches of the top wearing surface of pavement; placement of a fresh oil application over the ground pavement; and placement of 2.25 inches of an asphalt layer over the oil application to provide a new, smooth riding surface.

Temporary daily lane closures, Monday through Saturday, will be required to accomplish this work. Watch out for fresh oil signs and flaggers, and reduce speed while traveling through the construction zone. Motorists should expect delays, increased travel times during the resurfacing process, and are advised to consider alternate routes during the afforementioned work.

Questions or concerns may be directed to John Guddendorf at (630) 816-9671, or Bryan Schramer at (630) 762-2744. For all Kane County traffic advisories, see www.co.kane.il.us/dot/trafficalerts.

About Elburn Herald

The Elburn Herald has been serving the Kaneland communities since 1908. To reach our editor, Keith Beebe, email info@elburnherald.com, or call (630) 365-6446, ext. 105. To reach our owner/publisher, Ryan Wells, email RyanWells@elburnherald.com, or call (630) 365-6446, ext. 107.

You must be logged in to post a comment Login